• ACTUALITÉS
  • À PROPOS
    • Investir
    • Services de remboursement
  • FAQ
  • Coordonnées
  • Mon compte
  • …
    • EnglishEnglish
    • FrançaiseFrançaise
    • EspañolaEspañola
    • ItalianoItaliano
    • РусскийРусский

TeraWulf goes nuclear: 8,000 rigs spool up in Nautilus mining facility

    Bitcoin mining company TeraWulf has fired up a new “behind the meter” mining facility powered by 100% nuclear power in Pennsylvania.

    Uncategorized

    0 Comment

    Post navigation

    Yuga Labs’ first Bitcoin NFT auction nets $16.5M in 24 hours
    ‘Home’ regulator could solve crypto’s ‘fragmented supervision’ issue: Comptroller

    Leave a Reply Cancel reply

    Image Missing

    Votre partenaire sûr dans la croissance de la richesse cryptographique

    Contacts

    • Tower Ten, 20th floor, Strawinskylaan 1665, 1077 XX Amsterdam

    • +4367762309684

    • support@virexiscapital.com

    • Du lundi au vendredi : 9h00 - 17h00

    virexiscapital.com © 2026 All rights reserved.